koninkske
12-14-2007, 07:18 AM
I think this is a very common problem for which i cant find a solution. I have a model A with viewsets and a drawing with the according views.
Now i want to take a copy B (completely same geometry) but with other sysid and most important : i want the drawing also copied and referring to the new viewset. In other words : the existing drawing from model A needs to be attached to the new model B.
In my opinion it should be possible to do it as there is an existing goodie who makes it able to attach manually a view set to a view.
I use this right now but its a waste of time and could be put in a macro and under a button.
Seperate from that : is there a faster way of copying a model and his attached drawing then manually connecting the views to the new viewset?
Now i want to take a copy B (completely same geometry) but with other sysid and most important : i want the drawing also copied and referring to the new viewset. In other words : the existing drawing from model A needs to be attached to the new model B.
In my opinion it should be possible to do it as there is an existing goodie who makes it able to attach manually a view set to a view.
I use this right now but its a waste of time and could be put in a macro and under a button.
Seperate from that : is there a faster way of copying a model and his attached drawing then manually connecting the views to the new viewset?